Mon to Fri 7:00 AM to 6:00 PM, Sat 9:00 AM to 2:00 PM Now booking fall 2026 projects

Projects

Recent work across Regina and area.

Photos are of our own completed projects. Filter by residential or commercial.

Modern farmhouse new build
Residential

Modern farmhouse new build

2,140 square foot two-storey on a walkout lot, board-and-batten exterior, covered porch, triple garage.

The Greens on Gardiner, Regina

Bungalow kitchen opening
Residential

Bungalow kitchen opening

Removed a bearing wall, added a walnut island and a five-foot window over the sink in a 1962 bungalow.

Whitmore Park, Regina

Dental clinic build-out
Commercial

Dental clinic build-out

3,200 square foot tenant improvement with six operatories, a wood-slat reception wall and barrier-free washrooms, delivered in nine weeks.

East Regina

Basement with wet bar and gym
Residential

Basement with wet bar and gym

Full development with a glass-walled gym, wet bar, fourth bedroom and three-piece bath.

Harbour Landing, Regina

Acreage shop, 30 by 40
Residential

Acreage shop, 30 by 40

Heated in-slab shop with a 14-foot overhead door, 100-amp sub-panel and a mezzanine.

Lumsden area

Two-tier deck and pergola
Residential

Two-tier deck and pergola

Composite two-tier deck on screw piles with a cedar pergola, privacy screens and aluminum rail.

Emerald Park

Second-storey addition
Residential

Second-storey addition

Added three bedrooms and two baths above a 1970s bungalow, with new stucco to match and a full re-roof.

Lakeview, Regina

Curbless primary ensuite
Residential

Curbless primary ensuite

Curbless tiled shower, freestanding tub, floating double vanity and heated floors.

Cathedral, Regina

Strip-mall facade renewal
Commercial

Strip-mall facade renewal

New dark metal cladding, storefront glazing and LED soffit lighting across a five-unit strip, no tenant closures.

Albert Street North, Regina

Client words

What Regina homeowners and business owners say.

Every review here is from a real client of ours and we can put you in touch with them.

The quote was the invoice, to the dollar. Cody and the crew were in and out in five weeks and the basement is warmer than the main floor. We have already sent two neighbours their way.

Karen and Dave MolnarBasement development, Harbour Landing

Mike met the adjuster on site, wrote the scope the way the insurer wanted it, and the new roof was on before the next storm rolled through. Zero hassle for me.

Gerry FitzpatrickRoof and siding after the July hail

Nine weeks from landlord approval to our first patient. Priya kept the schedule updated daily and handled every inspection. We would not open a second location with anyone else.

Dr. Arjun MehtaDental clinic build-out, East Regina

Free on-site estimates

Planning a build or renovation this season?

Tell us what you have in mind and we will come out, measure, listen and send a written fixed-price quote within five business days.